Sequencing Tasks with Exponential Service Times to Minimize the Expected Flow Time or Makespan
From MaRDI portal
Publication:3902467
DOI10.1145/322234.322242zbMATH Open0454.68016OpenAlexW2085298577MaRDI QIDQ3902467FDOQ3902467
John Bruno, Greg N. Frederickson, Peter Downey
Publication date: 1981
Published in: Journal of the ACM (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1145/322234.322242
Deterministic scheduling theory in operations research (90B35) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20)
Cited In (21)
- Simple Strategies in Multi-Objective MDPs
- Scheduling Stochastic Jobs with a Two-Point Distribution on Two Parallel Machines
- Preemptive stochastic online scheduling on two uniform machines
- Robust scheduling of parallel machines with sequence-dependent set-up costs
- Analysis of Smith's rule in stochastic machine scheduling
- Scheduling tasks with exponential duration on unrelated parallel machines
- A uniformization-based algorithm for continuous-time stochastic games model checking
- Scheduling Two-Point Stochastic Jobs to Minimize the Makespan on Two Parallel Machines
- Analysis of computer job control under uncertainty
- Markov automata with multiple objectives
- Efficient computation of time-bounded reachability probabilities in uniform continuous-time Markov decision processes
- Approximation results in parallel machines stochastic scheduling
- PAC Statistical Model Checking of Mean Payoff in Discrete- and Continuous-Time MDP
- Optimal sequences in stochastic single machine shops
- Minimizing expected makespans of multi-priority classes of jobs on uniform processors
- Time complexity of single machine scheduling with stochastic precedence constraints
- A case for on-machine load balancing
- On index policies for stochastic minsum scheduling
- Cost vs. time in stochastic games and Markov automata
- A Tight 2-Approximation for Preemptive Stochastic Scheduling
- Greed Works—Online Algorithms for Unrelated Machine Stochastic Scheduling
This page was built for publication: Sequencing Tasks with Exponential Service Times to Minimize the Expected Flow Time or Makespan
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3902467)