scientific article; zbMATH DE number 8819
From MaRDI portal
Publication:3971303
Recommendations
- EQUIPMENT REPLACEMENT UNDER TECHNOLOGICAL ADVANCES
- EQUIPMENT REPLACEMENT WITH CONSIDERATION OF TECHNOLOGICAL ADVANCES : DETERMINATION OF REPLACEMENT TIMES BY CONTROL LIMIT POLICY
- Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs
- A discrete maintenance and replacement model under technological breakthrough expectations
- Equipment replacement under technological change
Cited in
(32)- A framework for replacement analysis
- A model for equipment replacement due to technological obsolescence
- Strategic capital budgeting: Asset replacement under market uncertainty
- Time-cost substitutability, earlycutting threat, and innovation timing
- Replacement decisions with multiple stochastic values and depreciation
- Capacity planning with technology replacement by stochastic dynamic programming
- Fleet replacement under technological shocks
- A paradox in equipment replacement under technological improvement
- Multiple asset replacement analysis under variable utilization and stochastic demand
- Endogenous timing in the switching of technology with Marshallian externalities
- On optimal replacement thresholds with technological expectations
- Integrating equipment investment strategy with maintenance operations under uncertain failures
- Capital renewal as a real option
- Infinite horizon optimality criteria for equipment replacement under technological change
- Technology choice and timing with positive network effects
- Optimal equipment replacement without paradoxes: A continuous analysis
- A decision framework for enterprise resource planning maintenance and upgrade: A client perspective
- Technical Note—A Dual Machine Replacement Model: A Note on Planning Horizon Procedures for Machine Replacements
- A discounted machine-replacement model with an expected future technological breakthrough
- EQUIPMENT REPLACEMENT WITH CONSIDERATION OF TECHNOLOGICAL ADVANCES : DETERMINATION OF REPLACEMENT TIMES BY CONTROL LIMIT POLICY
- Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs
- A 0-1 linear programming formulation for solving an equipment replacement problem
- Equipment replacement under technological change
- The Equipment Replacement Problem : A Simple Solution Technique
- A linear programming formulation with integer solutions for solving an equipment replacement problem with multiple assets: the concave demand case
- EQUIPMENT REPLACEMENT UNDER TECHNOLOGICAL ADVANCES
- scientific article; zbMATH DE number 1423919 (Why is no real title available?)
- Two-cycle optimization in replacement models with non-exponential technological improvement
- EQUIPMENT REPLACEMENT BEHAVIOR UNDER INNOVATIVE TECHNOLOGICAL ADVANCES
- A discrete maintenance and replacement model under technological breakthrough expectations
- Optimal timing decisions for the introduction of new technologies
- Asset management with reverse product flows and environmental considerations
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3971303)