Joint Determination of Production Cycle and Inspection Intervals in a Deteriorating Production System

From MaRDI portal
Publication:3983494


DOI10.1057/jors.1991.148zbMath0742.90036MaRDI QIDQ3983494

No author found.

Publication date: 27 June 1992

Published in: Journal of the Operational Research Society (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1057/jors.1991.148


90B30: Production models

90B05: Inventory, storage, reservoirs


Related Items

Impact of inspection errors on the lot size problem, Simultaneous determination of the optimal production-inventory and product inspection policies for a deteriorting production system, Sustainable inventory management with hybrid production system and investment to reduce defects, Joint optimization of condition-based maintenance and production lot-sizing, Integrated production-inventory models with imperfect production processes and a limited capacity for raw materials, Joint determination of production run length and number of standbys in a deteriorating production process, A production: inventory model for defective items with shortages incorporating inflation and time value of money, Inventory models for defective items incorporating marketing decisions with variable production cost, Optimal production run time for a deteriorating production system under an extended inspection policy, Inventory models for imperfect production and inspection processes with various inspection options under one-time and continuous improvement investment, Determining the optimal production--maintenance policy with inspection errors: Using a Markov chain, An optimal production run time with imperfect production processes and allowable shortages, The impact of a free-repair warranty policy on EMQ model for imperfect production systems, Effect of warranty and quantity discounts on a deteriorating production system with a Markovian production process and allowable shortages, A common cycle approach for solving the economic lot and inspection scheduling problem, Inspection scheduling for imperfect production processes under free repair warranty contract, Modeling an inventory problem with random supply, inspection and machine breakdown, Joint determination of optimal safety stocks and production policy for an imperfect production system, Optimal production run length for products sold with warranty in an imperfect production system with allowable shortages, Combined production-maintenance decisions in situations with process deterioration, Capital investment in setup cost reduction for a lot-size, reorder point model, Simultaneous determination of production and maintenance schedules using in‐line equipment condition and yield information, ECONOMIC PRODUCTION RUN LENGTH AND WARRANTY PERIOD FOR PRODUCT WITH WEIBULL LIFETIME