Analysis of a Kanban Discipline for Cell Coordination in Production Lines, II: Stochastic Demands
From MaRDI portal
Publication:3988909
DOI10.1287/OPRE.39.5.807zbMATH Open0800.90551OpenAlexW2098286545MaRDI QIDQ3988909FDOQ3988909
Authors: Debasis Mitra, I. Mitrani
Publication date: 28 June 1992
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.39.5.807
Cited In (19)
- Comparing kanban control with the theory of constraints using Markov chains
- Analysis of a synchronization station for the performance evaluation of a kanban system with a general arrival process of demands
- Processing networks with planned inventories: Tandem queues with feedback
- Optimal numbers of two kinds of kanbans in a JIT production system
- Analysis of a production system in a general configuration
- A review of optimisation models of Kanban-based production systems
- Limiting results for multiprocessor systems with breakdowns and repairs
- Tandem queues with general blocking: A unified model and comparison results
- Lead time and response time in a pull production control system
- Analysis of assembly systems controlled with kanbans
- Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
- Performance analysis of single stage kanban controlled production systems using parametric decomposition
- Stochastic analysis of TPS: expose and eliminate variability by highly specifying WCP
- Properties of serial kanban systems
- Optimal configuration of a decentralized, market-driven production/inventory system
- The performance evaluation of a multi-stage JIT production system with stochastic demand and production capacities
- Analysis of decentralized multi‐product pull systems with lost sales
- On vector-Kronecker product multiplication with rectangular factors
- Analysis of production control systems kanban and CONWIP
This page was built for publication: Analysis of a Kanban Discipline for Cell Coordination in Production Lines, II: Stochastic Demands
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q3988909)