Scheduling modular projects on a bottleneck resource
From MaRDI portal
Publication:398901
Recommendations
- A RESOURCE CONSTRAINED PROJECT SCHEDULING PROBLEM WITH REATTEMPT AT FAILURE : A HEURISTIC APPROACH
- An exact method for scheduling of the alternative technologies in R\&D projects
- Scheduling tasks with failure probabilities to minimize expected cost
- Scheduling of resource-constrained projects
- Resource constrained scheduling simulation model for alternative stochastic network projects.
Cites work
- scientific article; zbMATH DE number 1670525 (Why is no real title available?)
- scientific article; zbMATH DE number 5542185 (Why is no real title available?)
- scientific article; zbMATH DE number 3720658 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- scientific article; zbMATH DE number 1052006 (Why is no real title available?)
- scientific article; zbMATH DE number 839550 (Why is no real title available?)
- Diagnosing double regular systems
- Executing production schedules in the face of uncertainties: a review and some future directions
- Markov and Markov-Regenerative <scp>pert</scp> Networks
- On generating all maximal independent sets
- Optimal Testing Procedures for Special Structures of Coherent Systems
- Project scheduling under uncertainty: survey and research potentials
- Rangen: A random network generator for activity-on-the-node networks
- Rescheduling manufacturing systems: A framework of strategies, policies, and methods
- Scheduling Markovian PERT networks to maximize the net present value
- Sequencing with Series-Parallel Precedence Constraints
- Sequential testing of complex systems: a review
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- Some Reliability Fault-Testing Models
- The Recognition of Series Parallel Digraphs
Cited in
(15)- A stochastic bi-objective project scheduling model under failure of activities
- Scheduling tasks with failure probabilities to minimize expected cost
- Stochastic project scheduling with hierarchical alternatives
- Maximum probabilistic all-or-nothing paths
- Project scheduling under the threat of catastrophic disruption
- A branch-and-bound algorithm for scheduling of new product development projects
- State-Variable Modeling for a Class of Two-Stage Stochastic Optimization Problems
- A Genetic Algorithm for Scheduling Alternative Tasks Subject to Technical Failure
- On the complexity of project scheduling to minimize exposed time
- Evolutionary multi-objective resource allocation and scheduling in the Chinese navigation satellite system project
- An exact method for scheduling of the alternative technologies in R\&D projects
- Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure
- Moments and distribution of the net present value of a serial project
- Sequential testing of \(n\)-out-of-\(n\) systems: precedence theorems and exact methods
- Project planning with alternative technologies in uncertain environments
This page was built for publication: Scheduling modular projects on a bottleneck resource