A cutting and scheduling problem in float glass manufacturing
From MaRDI portal
Publication:398905
DOI10.1007/S10951-013-0335-ZzbMATH Open1297.90055OpenAlexW2060756775MaRDI QIDQ398905FDOQ398905
Authors: Byungsoo Na, S. Ahmed, G. L. Nemhauser, Joel Sokol
Publication date: 18 August 2014
Published in: Journal of Scheduling (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s10951-013-0335-z
Recommendations
- Solving a large cutting problem in the glass manufacturing industry
- A heuristic to schedule flexible job-shop in a glass factory
- A constructive heuristic for staff scheduling in the Glass industry
- Evolutionary Computation in Combinatorial Optimization
- A Cutting Stock and Scheduling Problem in the Copper Industry
- An integrated cutting stock and sequencing problem
- An Application of Travelling-Salesman Routines to Solve Pattern-Allocation Problems in the Glass Industry
- A cutting plane algorithm for a single machine scheduling problem
- A Cutting Plane Approach to the Sequential Ordering Problem (with Applications to Job Scheduling in Manufacturing)
- Two dimensional guillotine cutting stock and scheduling problem in printing industry
Cites Work
Cited In (5)
- Solving a large cutting problem in the glass manufacturing industry
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan
- A heuristic to schedule flexible job-shop in a glass factory
- Mathematical modeling and optimal blank generation in glass manufacturing
- A survey of scheduling problems with no-wait in process
This page was built for publication: A cutting and scheduling problem in float glass manufacturing
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q398905)