Batching and Scheduling Jobs on Batch and Discrete Processors

From MaRDI portal
Publication:4022932

DOI10.1287/opre.40.4.750zbMath0758.90042OpenAlexW1966303191MaRDI QIDQ4022932

Javad H. Ahmadi, Sriram Dasu, Christopher S. Tang, Reza H. Ahmadi

Publication date: 17 January 1993

Published in: Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/opre.40.4.750



Related Items

Minimizing due date related performance measures on two batch processing machines, Machine scheduling with job delivery coordination, Analysis of batched service time data using Gaussian and semi-parametric kernel models, Approximation algorithms for the single-machine scheduling with a period of maintenance, Minimizing total completion time on a batch processing machine with job families, Integrated production and transportation on parallel batch machines to minimize total weighted delivery time, Minimizing total weighted tardiness on a single batch process machine with incompatible job families, Complexity of flow shop scheduling problems with transportation constraints, A hybrid two-stage transportation and batch scheduling problem, Two-machine flowshop scheduling problems involving a batching machine with transportation or deterioration consideration, Minimizing makespan on a single burn-in oven with job families and dynamic job arrivals, A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time, Minimizing makespan in a two-machine flowshop scheduling with batching and release time, A note on the complexity of flow shop scheduling with transportation constraints, A constant-factor approximation algorithm for multi-vehicle collection for processing problem, Minimizing makespan with multiple-orders-per-job in a two-machine flowshop, Heuristics for parallel machine scheduling with batch delivery consideration, Scheduling job shops with batch machines using the Lagrangian relaxation technique, Batch sequencing and cooperation, Formulating a scheduling problem with almost identical jobs by using positional completion times, Model approximation for batch flow shop scheduling with fixed batch sizes, A Two-Stage Flexible Flowshop Problem with Deterioration, Realistic two-stage flowshop batch scheduling problems with transportation capacity and times, MIP formulations and heuristics for solving parallel batching problems, Batch-size-based rearrangement of the shop floor into mini-lines, A two stage scheduling with transportation and batching, Earliness and tardiness scheduling problems on a batch processor, Online scheduling on an unbounded parallel-batch machine and a standard machine to minimize makespan, Learning effective dispatching rules for batch processor scheduling, Scheduling with batching: A review, A problem reduction and decomposition approach for scheduling for a flowshop of batch processing machines, Multiple orders per job batch scheduling with incompatible jobs, Parallel batch scheduling with inclusive processing set restrictions and non-identical capacities to minimize makespan, Integrated problem of soaking pit heating and hot rolling scheduling in steel plants, The coordination of transportation and batching scheduling, SINGLE MACHINE SCHEDULING WITH BATCH DELIVERY TO MULTIPLE CUSTOMERS IN A STAR-SHAPED NETWORK, Machine scheduling with transportation considerations, Scheduling batches with simultaneous job processing for two-machine shop problems, Two-stage hybrid flow shop scheduling with dynamic job arrivals, Scheduling a single batch processing machine with non-identical job sizes, Mixed integer formulation to minimize makespan in a flow shop with batch processing machines, Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date, Dynamic scheduling of batch servers with compatible product families, The use of upstream and downstream information in scheduling semiconductor batch operations, Scheduling batch processing machines with incompatible job families, Batch scheduling in the no-wait two-machine flowshop to minimize the makespan, Minimizing number of tardy jobs on a batch processing machine with incompatible job families, Integrated design approach for virtual production line-based reconfigurable manufacturing systems, Scheduling parallel batch processing machines with arbitrary job sizes and incompatible job families, Two-machine flowshop batching and scheduling, On-line scheduling algorithms for a batch machine with finite capacity, Minimizing makespan in a two-machine flowshop with dynamic arrivals allowed, Minimizing the makespan on a batch machine with non-identical job sizes: An exact procedure, Scheduling a proportionate flow shop of batching machines, Adaptive scheduling of batch servers in flow shops, Semiconductor manufacturing scheduling of jobs containing multiple orders on identical parallel machines, Effective hybrid genetic algorithm for minimizing makespan on a single-batch-processing machine with non-identical job sizes, Controlling job arrivals with processing time windows into batch processor buffer, Scheduling with agreeable release times and due dates on a batch processing machine, Scheduling with families of jobs and delivery coordination under job availability, A survey of scheduling with parallel batch (p-batch) processing, Scheduling by positional completion times: Analysis of a two-stage flow shop problem with a batching machine, Minimizing makespan on a single burn-in oven in semiconductor manufacturing, A two-stage flow shop scheduling problem on a batching machine and a discrete machine with blocking and shared setup times, Online algorithms to schedule a proportionate flexible flow shop of batching machines, A HYBRID TWO-STAGE FLOWSHOP SCHEDULING PROBLEM, Heuristic scheduling of jobs on a multi-product batch processing machine, A new dynamic look-ahead scheduling procedure for batching machines