scientific article; zbMATH DE number 3473515
From MaRDI portal
Publication:4058784
Extremal problems in graph theory (05C35) Graph theory (05Cxx) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02) Software, source code, etc. for problems pertaining to operations research and mathematical programming (90-04) Deterministic network models in operations research (90B10) Programming involving graphs or networks (90C35)
Cited in
(11)- Schedule-induced posets
- Activity-on-node networks with minimal and maximal time lags and their application to make-to-order production
- Piecewise algebraic functions
- Recent advances in temporal analysis of GERT networks
- Stochastic scheduling problems I — General strategies
- On cyclic sequence types for constructing cyclic schedules
- A continuous linear optimization model for the exact solution of travelling-salesman-problems in connexion with expansion planning of ring networks
- Multiterminal network flows and applications
- Solving the transportation problem with mixed constraints
- An evolutionary algorithm for the resource-constrained project scheduling problem with minimum and maximum time lags
- Scheduling of project networks
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4058784)