Coordinating Aggregate and Detailed Scheduling in the One-Machine Job Shop: II—Computation and Structure
From MaRDI portal
Publication:4060707
DOI10.1287/opre.23.2.312zbMath0304.90059OpenAlexW1979236142MaRDI QIDQ4060707
L. F. Gelders, Paul R. Kleindorfer
Publication date: 1975
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.23.2.312
Related Items
Minimizing the weighted sum of squared tardiness on a single machine, Mathematical Modeling of Scheduling Problems, Four solution techniques for a general one machine scheduling problem. A comparative study, A survey of algorithms for the single machine total weighted tardiness scheduling problem, Heuristic methods and applications: A categorized survey