Exact, Approximate, and Guaranteed Accuracy Algorithms for the Flow-Shop Problem n / 2 / F / F¯
From MaRDI portal
Publication:4072835
Cited in
(13)- Using branch-and-bound algorithms to obtain suboptimal solutions
- A SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOP
- The two-machine total completion time flow shop problem
- A comparison of local search methods for flow shop scheduling
- A robust two-machine flow-shop scheduling model with scenario-dependent processing times
- A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime
- Two- and three-machine flow shop scheduling problems with equal sized transfer batches
- Improved lower bounds for minimizing the sum of completion times of n jobs over m machines in a flow shop
- A two-machine flowshop problem with two agents
- Lower bounds for minimizing total completion time in a two-machine flow shop
- A bicriteria flowshop scheduling with a learning effect
- A two-machine flowshop scheduling problem with a truncated sum of processing-times-based learning function
- scientific article; zbMATH DE number 502872 (Why is no real title available?)
This page was built for publication: Exact, Approximate, and Guaranteed Accuracy Algorithms for the Flow-Shop Problem n / 2 / F / F¯
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4072835)