On scheduling with earliest starts and due dates on a group of identical machines
From MaRDI portal
Publication:4085477
DOI10.1002/nav.3800220411zbMath0322.90029OpenAlexW2029732971MaRDI QIDQ4085477
Publication date: 1975
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800220411
Numerical mathematical programming methods (65K05) Integer programming (90C10) Deterministic scheduling theory in operations research (90B35)
Related Items (2)
Periodic replacement when minimal repair costs vary with time ⋮ Heuristic methods and applications: A categorized survey
This page was built for publication: On scheduling with earliest starts and due dates on a group of identical machines