Multi-product lot-sizing and sequencing on a single imperfect machine
From MaRDI portal
(Redirected from Publication:409261)
Recommendations
- Lot-Sizing and Sequencing on a Single Imperfect Machine
- Cyclic lot-sizing problems with sequencing costs
- Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs
- The discrete lot-sizing and scheduling problem with sequence-dependent setup costs
- Production lot sizing in failure prone two-stage serial systems
Cites work
- scientific article; zbMATH DE number 988191 (Why is no real title available?)
- scientific article; zbMATH DE number 5540201 (Why is no real title available?)
- scientific article; zbMATH DE number 46243 (Why is no real title available?)
- scientific article; zbMATH DE number 3639144 (Why is no real title available?)
- A Dynamic Programming Approach to Sequencing Problems
- A survey of scheduling problems with setup times or costs
- An FPTAS for a single-item capacitated economic lot-sizing problem with monotone cost structure
- An unconstrained optimization problem is NP-hard given an oracle representation of its objective function: a technical note
- Batching work and rework processes with limited deterioration of reworkables
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity
- Lot Sizing with Random Yields: A Review
- Lot-Sizing and Sequencing on a Single Imperfect Machine
- Lot-sizing for a single-stage single-product production system with rework of perishable production defectives
- Optimizing a production system with rework and equal sized batch shipments
- Production Lot Sizing with Machine Breakdowns
- Scheduling with batching: A review
Cited in
(3)
This page was built for publication: Multi-product lot-sizing and sequencing on a single imperfect machine
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q409261)