Optimal flowshop schedules with no intermediate storage space
From MaRDI portal
Publication:4094642
Cited in
(11)- Two machine flow shop scheduling problem with no wait in process: Controllable machine speeds
- On the complexity and some properties of multi-stage scheduling problems with earliness and tardiness penalties
- Production scheduling with applications in the printing industry
- A review of TSP based approaches for flowshop scheduling
- A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage.
- Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays
- Flow-Shop Sequencing with no Intratnachine Waiting: Minimization of Total Waiting Cost
- Minimizing total completion time in two-machine flow shops with exact delays
- Solving the continuous flow-shop scheduling problem by metaheuristics.
- Some effective heuristics for no-wait flowshops with setup times to minimize total completion time
- Fitness landscape analysis for the no-wait flow-shop scheduling problem
This page was built for publication: Optimal flowshop schedules with no intermediate storage space
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4094642)