Optimal length of lease period and maintenance policy for leased equipment with a control-limit on age
From MaRDI portal
(Redirected from Publication:409844)
Recommendations
- Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method
- Optimal preventive maintenance of leased equipment with corrective minimal repairs
- Principal-agent maintenance problem
- Bayesian decision making in determining optimal leased term and preventive maintenance scheme for leased facilities
- A decision optimization model for leased manufacturing equipment with warranty under forecasting production/maintenance problem
Cites work
- scientific article; zbMATH DE number 4187441 (Why is no real title available?)
- A SUMMARY OF PERIODIC REPLACEMENT WITH MINIMAL REPAIR AT FAILURE
- A survey of maintenance policies of deteriorating systems
- Leasing and selling: Optimal marketing strategies for a durable goods firm
- Optimal maintenance and replacement policy for a deteriorating system with increased mean downtime
- Optimal preventive maintenance of leased equipment with corrective minimal repairs
- Optimal preventive-maintenance warranty policy for repairable products
- Optimal threshold value of failure-rate for leased products with preventive maintenance actions
- Optimum Preventive Maintenance Policies
- Periodical replacement problem without assuming minimal repair
- Replacement policies of a shock model with imperfect preventive maintenance
Cited in
(9)- Principal-agent maintenance problem
- Maintenance models in warranty: a literature review
- Bayesian decision making in determining optimal leased term and preventive maintenance scheme for leased facilities
- Optimal preventive maintenance of leased equipment with corrective minimal repairs
- Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method
- The optimal lifetime of capital equipment
- scientific article; zbMATH DE number 6613242 (Why is no real title available?)
- A decision optimization model for leased manufacturing equipment with warranty under forecasting production/maintenance problem
- Lease expiration management for a single lease term in the apartment industry
This page was built for publication: Optimal length of lease period and maintenance policy for leased equipment with a control-limit on age
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q409844)