Technical Note—Finding Some Essential Characteristics of the Feasible Solutions for a Scheduling Problem
From MaRDI portal
Publication:4102899
DOI10.1287/opre.24.4.774zbMath0335.90027OpenAlexW2145511929MaRDI QIDQ4102899
Jacques Erschler, J. P. Vernhes, François Roubellat
Publication date: 1976
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.24.4.774
Deterministic scheduling theory in operations research (90B35) Queueing theory (aspects of probability theory) (60K25)
Related Items
A local constraint based analysis approach to project scheduling under general resource constraints, Characterizing the set of feasible sequences for n jobs to be carried out on a single machine, Job sequencing with fuzzy processing times, Reducibility among single machine weighted completion time scheduling problems, Dynamic problem structure analysis as a basis for constraint-directed scheduling heuristics, A constraint-based perspective in resource constrained project scheduling, Dispatching rules in scheduling Dispatching rules in scheduling: a fuzzy approach, An improved constraint satisfaction adaptive neural network for job-shop scheduling, Local adjustments: A general algorithm, A new adaptive neural network and heuristics hybrid approach for job-shop scheduling, Production/maintenance cooperative scheduling using multi-agents and fuzzy logic, Deterministic job-shop scheduling: Past, present and future, Two-machine shop scheduling: Compromise between flexibility and makespan value, On not-first/not-last conditions in disjunctive scheduling, Computing improved optimal solutions to max-min flexible constraint satisfaction problems, Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge, Using MLP networks to design a production scheduling system