scientific article; zbMATH DE number 3534262
zbMATH Open0342.90020MaRDI QIDQ4110786FDOQ4110786
Authors: Gary E. Whitehouse
Publication date: 1973
Title of this publication is not available (Why is that?)
Programming involving graphs or networks (90C35) Deterministic network models in operations research (90B10) Reliability, availability, maintenance, inspection in operations research (90B25) Extremal problems in graph theory (05C35) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02) Inventory, storage, reservoirs (90B05) Stochastic network models in operations research (90B15) General systems (93A10) Special processes (60Kxx)
Cited In (20)
- Smooth
- Conditional corrective action plan for three attribute classes
- Using stochastic decision networks to assess costs and completion times of refurbishment work in construction
- Recent advances in temporal analysis of GERT networks
- An analytical method for cost analysis in multi-stage supply chains: a stochastic network model approach
- On the temporal analysis of special GERT networks using a modified Markov renewal process
- A stochastic network formulation for complex sequential processes
- Modelling high-school education systems in Saudi Arabia using the GERT technique
- GERT models in an educational institution
- Flowgraph models: a Bayesian case study in construction engineering
- Controlled alternative activity networks for project management
- Activity nets: A guided tour through some recent developments
- Application of fuzzy distributions on project management
- Project scheduling by special GERT networks
- A new algorithm for finding the shortest path between a specified pair of nodes in a graph of nonnegative arcs
- Development of GERT model for precommissioning/commissioning of water treatment plant
- Stochastisches PERT — Eine vergleichende Untersuchung über die Effizienz eines Verfahrens zur stochastischen Projektplanung
- Business process modelling with stochastic networks
- Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods)
- Strict consecutive\(k\)-out-of-\(n\:F\) system: GERT analysis
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4110786)