Minimizing makespan in an ordered flow shop with machine-dependent processing times
From MaRDI portal
(Redirected from Publication:411247)
Recommendations
- Makespan minimization for the \(m\)-machine ordered flow shop scheduling problem
- Makespan minimization in machine dominated flowshop
- On the Minimization of the Makespan Subject to Flowtime Optimality
- Minimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup times
- Minimizing makespan with multiple-orders-per-job in a two-machine flowshop
- Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions
- Makespan minimization flowshop with position dependent job processing times -- computational complexity and solution algorithms
- Minimizing makespan on an \(m\)-machine re-entrant flowshop
- scientific article; zbMATH DE number 1437089
- Minimising makespan in the two-machine flow-shop with release times
Cites work
- scientific article; zbMATH DE number 5345854 (Why is no real title available?)
- A note on the proportionate flow shop with a bottleneck machine
- A state-of-the-art review on scheduling with learning effects
- A survey of scheduling with controllable processing times
- An efficient algorithm for determining the convex hull of a finite planar set
- Faster algorithms for the shortest path problem
- Flowshop Sequencing Problem with Ordered Processing Time Matrices
- Flowshop sequencing problem with ordered processing time matrices: A general case
- Flowshop-scheduling problems with makespan criterion: a review
- Focused Scheduling in Proportionate Flowshops
- Minimizing maximum completion time in a proportionate flow shop with one machine of different speed
- Minimizing total completion time in a two-machine flowshop: Analysis of special cases
- Minimizing total weighted completion time in a proportionate flow shop
- Ordered Flow Shop Problems with no In-Process Waiting: Further Results
- The Complexity of Flowshop and Jobshop Scheduling
- The three-machine proportionate flow shop problem with unequal machine speeds
- Time-dependent scheduling
- Two-machine proportionate flowshop scheduling with breakdowns to minimize maximum lateness
Cited in
(8)- Minimizing makespan and throughput times at Aalsmeer flower auction
- Makespan minimization in machine dominated flowshop
- Two-machine flow shop scheduling problem with an outsourcing option
- Outsourcing decisions in \(m\)-machine permutation flow shop scheduling problems with machine-dependent processing times
- Mixed integer formulation to minimize makespan in a flow shop with batch processing machines
- Predictive-reactive scheduling for single surgical suite subject to random emergency surgery
- Minimizing flow time in a flow-line manufacturing cell with family setup times
- Proportionate flowshops with general position-dependent processing times
This page was built for publication: Minimizing makespan in an ordered flow shop with machine-dependent processing times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q411247)