Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”

From MaRDI portal
Publication:4118923

DOI10.1287/mnsc.23.3.332zbMath0348.90035OpenAlexW2154611068MaRDI QIDQ4118923

No author found.

Publication date: 1976

Published in: Management Science (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1287/mnsc.23.3.332




Related Items (18)

Lot streaming in three-stage production processesA fuzzy integrated inventory system with end of life treatment: a possibility in sports industryOptimal lot streaming for multiple products in a two-machine flow shopAn optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factorsOptimizing multi-stage production for an assembly-type supply chain with unequal sized batch shipmentsA genetic algorithm for solving the economic lot scheduling problem in flow shopsMulti-stage production-inventory systemsOptimal mixed batch shipment policy with variable safety factor for the single-vendor single-buyer production-inventory systemAn optimal mixed batch shipment policy for multiple items in a single-supplier multiple-retailer integrated systemThe two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops.The multi-product, economic lot-sizing problem in flow shops: The powers-of-two heuristicOptimal inventory policies for serial-type and assembly-type supply chains with equal sized batchLot streaming with detached setups in three-machine flow shopsFlow shop scheduling with lot streamingCollaborative policy of the supply-hub for assemble-to-order systems with delivery uncertaintySingle supplier single retailer inventory model controlled by the reorder and shipping points with sharing informationOn the equivalence of small batch assembly line balancing and lot streaming in a flow shopMinimizing the mean weighted absolute deviation from due dates in lot-streaming flow shop scheduling




This page was built for publication: Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”