Two-stage output procedure of a finite dam
From MaRDI portal
Publication:4132064
Cited in
(14)- Continuous time inventory control for Wiener process demand
- A \(P_{\lambda}^M\)-policy for an \(M/G/1\) queueing system
- A Double Band Control Policy of a Brownian Perishable Inventory System
- N-Stage output procedure of a finite dam
- On a reflected Ornstein-Uhlenbeck process with an application
- An optimal \(P_{\lambda}^{M}\)-service policy for an \(M/G/1\) queueing system
- Impulse control of a brownian inventory system with supplier uncertainty
- A control of a brownian storage system with two switcnover drifts
- Optimal control of a finite dam with a sample path constraint
- The control of a finite dam with penalty cost function: Wiener process input
- A note on the expected discounted cost of operating a finite dam
- Optimal Control of a Large Dam
- Takács' asymptotic theorem and its applications: a survey
- Optimal control of dams using \(P_{\lambda,\tau}^{M}\) policies and penalty cost
This page was built for publication: Two-stage output procedure of a finite dam
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4132064)