Technical Note—Three-Stage Flow-Shops with Recessive Second Stage
From MaRDI portal
Publication:4147826
DOI10.1287/opre.26.1.207zbMath0371.90062MaRDI QIDQ4147826
Publication date: 1978
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.26.1.207
90B35: Deterministic scheduling theory in operations research
Related Items
The three-stage assembly flowshop scheduling problem, The job shop scheduling problem: Conventional and new solution techniques, Non-bottleneck machines in three-machine flow shops