Scheduling to Minimize Maximum Cumulative Cost Subject to Series-Parallel Precedence Constraints
From MaRDI portal
Publication:4152016
DOI10.1287/OPRE.26.1.141zbMATH Open0374.90034OpenAlexW2086037892MaRDI QIDQ4152016FDOQ4152016
Author name not available (Why is that?)
Publication date: 1978
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.26.1.141
Cited In (9)
- The project scheduling problem with production and consumption of resources: a list-scheduling based algorithm
- On strictly optimal schedules for the cumulative cost-optimal scheduling problem
- Sequencing to minimize the maximum renewal cumulative cost
- A bi-criterion approach to minimizing inventory costs on a single machine when early shipments are forbidden
- Sequencing with general precedence constraints
- Structural properties and tractability results for linear synteny
- Scheduling UET-UCT series-parallel graphs on two processors
- Effective optimization methods for single-machine scheduling (survey)
- Detecting race conditions in parallel programs that use one semaphore
This page was built for publication: Scheduling to Minimize Maximum Cumulative Cost Subject to Series-Parallel Precedence Constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4152016)