A heuristic network procedure for the assembly line balancing problem
DOI10.1002/NAV.3800250210zbMATH Open0402.90048OpenAlexW2162177341MaRDI QIDQ4187563FDOQ4187563
Authors: Peter A. Pinto, David G. Dannenbring, Basheer M. Khumawala
Publication date: 1978
Published in: Naval Research Logistics Quarterly (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1002/nav.3800250210
SchedulingSensitivity AnalysisComputational EfficiencyHeuristic AlgorithmNetwork ProgrammingComputational ExperienceAssembly Line Balancing ProblemShortest Route Algorithm
Numerical optimization and variational techniques (65K10) Programming involving graphs or networks (90C35) Applications of mathematical programming (90C90) Deterministic scheduling theory in operations research (90B35) Applications of graph theory to circuits and networks (94C15)
Cited In (2)
This page was built for publication: A heuristic network procedure for the assembly line balancing problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4187563)