scientific article; zbMATH DE number 370525
From MaRDI portal
Publication:4201451
DOI10.1002/1520-6750(199308)40:5%3C665::AID-NAV3220400509%3E3.0.CO;2-JzbMATH Open0776.90039MaRDI QIDQ4201451FDOQ4201451
Elliott N. Weiss, Scott E. Sampson
Publication date: 25 August 1993
Title of this publication is not available (Why is that?)
Recommendations
- scientific article; zbMATH DE number 7656034
- A local constraint based analysis approach to project scheduling under general resource constraints
- Local search methods for the discrete time/resource trade-off problem in project networks
- Problem space search algorithms for resource-constrained project scheduling
- PROGRESS: Optimally solving the generalized resource-constrained project scheduling problem
- Genetic local search for resource-constrained project scheduling under uncertainty
- scientific article
- A Branch-and-Bound Procedure for the Generalized Resource-Constrained Project Scheduling Problem
Deterministic scheduling theory in operations research (90B35) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Cites Work
Cited In (14)
- Title not available (Why is that?)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update
- The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models
- Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Scheduling and constraint propagation
- Justification technique generalizations
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- LSSPER: Solving the resource-constrained project scheduling problem with large neighbourhood search
- Title not available (Why is that?)
- Tabu search for resource-constrained scheduling
- Order-based neighborhoods for project scheduling with nonregular objective functions.
- A comparative study of both standard and adaptive versions of threshold accepting and simulated annealing algorithms in three scheduling problems
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4201451)