Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling
From MaRDI portal
Publication:4206555
DOI10.1057/jors.1989.196zbMath0687.90048OpenAlexW2035515281MaRDI QIDQ4206555
Publication date: 1989
Published in: Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1989.196
Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35)
Related Items (17)
Heuristics for scheduling resource-constrained projects in MPM networks ⋮ A local constraint based analysis approach to project scheduling under general resource constraints ⋮ Solving resource-constrained project scheduling problems: conceptual validation of FLP formulation and efficient permutation-based ABC computation ⋮ Experimental investigation of heuristics for resource-constrained project scheduling: an update ⋮ A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling ⋮ A hybrid metaheuristic for the resource-constrained project scheduling problem ⋮ A practical and robust execution time-frame procedure for the multi-mode resource-constrained project scheduling problem with minimal and maximal time lags ⋮ A constraint-based perspective in resource constrained project scheduling ⋮ A neurogenetic approach for the resource-constrained project scheduling problem ⋮ Efficient priority rules for the stochastic resource-constrained project scheduling problem ⋮ Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation ⋮ A framework for an interactive project scheduling system under limited resources ⋮ A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis ⋮ An integer linear programming model and a modified branch and bound algorithm for the project material requirements planning problem ⋮ Project scheduling under resource and mode identity constraints: Model, complexity, methods, and application ⋮ Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects ⋮ Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem
This page was built for publication: Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling