Single machine batch scheduling with two competing agents to minimize total flowtime

From MaRDI portal
Publication:420859

DOI10.1016/j.ejor.2011.06.037zbMath1238.90069OpenAlexW1973777183MaRDI QIDQ420859

Baruch Mor, Gur Mosheiov

Publication date: 23 May 2012

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2011.06.037



Related Items

Single machine scheduling with two competing agents, arbitrary release dates and unit processing timesTwo-agent scheduling on bounded parallel-batching machines with an aging effect of job-position-dependentSingle-machine serial-batch delivery scheduling with two competing agents and due date assignmentTwo-agent scheduling in a flowshopScheduling two job families on a single machine with two competitive agentsA tabu method for a two-agent single-machine scheduling with deterioration jobsScheduling problems with two competing agents to minimized weighted earliness-tardinessScheduling with two competing agents to minimize total weighted earlinessA note on batch scheduling on a two-machine flowshop with machine-dependent processing timesTwo-agent scheduling with agent specific batches on an unbounded serial batching machineTwo‐agent scheduling with linear resource‐dependent processing timesTwo-Machine and Two-Agent Flow Shop with Special Processing Times StructuresA two-agent single-machine scheduling problem with late work criteriaBounded parallel-batching scheduling with two competing agentsSerial-batching scheduling with two agents to minimize makespan and maximum costLess is more: variable neighborhood search for integrated production and assembly in smart manufacturingTwo-agent single-machine scheduling of jobs with time-dependent processing times and ready timesScheduling two agents with sum-of-processing-times-based deterioration on a single machineTwo-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectivesA just-in-time scheduling problem with two competing agentsTwo-agent scheduling on a single parallel-batching machine with equal processing time and non-identical job sizesTwo-agent single-machine scheduling with assignable due datesA common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problemsGroup Scheduling with Two Competing Agents on a Single MachineA two-agent single machine scheduling problem with due-window assignment and a common flow-allowanceTwo-agent scheduling on a single machine with release datesA Batch Scheduling Problem with Two AgentsScheduling to minimize the maximum total completion time per machineA Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work CriterionTwo-agent integrated scheduling of production and distribution operations with fixed departure times



Cites Work