scientific article; zbMATH DE number 1217257
From MaRDI portal
Publication:4214799
zbMATH Open0913.90130MaRDI QIDQ4214799FDOQ4214799
Publication date: 11 January 1999
Title of this publication is not available (Why is that?)
Recommendations
inspectionprobabilistic analysisbuffertwo-stage production systemmeasures of system performancetwo-stage-transfer line
Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30)
Cited In (7)
- Analysis of a two station flow-line with machine processing subject to inspection and rework
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Title not available (Why is that?)
- Expected Duration Analysis of a Two-Stage Transfer-Line Production System Subject to Inspection and Rework
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4214799)