Cost/risk balanced management of scarce resources using stochastic programming
From MaRDI portal
Publication:421743
DOI10.1016/j.ejor.2011.06.040zbMath1237.91173OpenAlexW2123785143MaRDI QIDQ421743
Paola Zuddas, Giovanni M. Sechi, Alexei A. Gaivoronski
Publication date: 14 May 2012
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2011.06.040
stochastic programmingrisk managementOR in natural resourceswater resources managementrisk/performance tradeoff
Applications of mathematical programming (90C90) Environmental economics (natural resource models, harvesting, pollution, etc.) (91B76)
Related Items (5)
Medium range optimization of copper extraction planning under uncertainty in future copper prices ⋮ Operational risk: emerging markets, sectors and measurement ⋮ A multi-level Taguchi-factorial two-stage stochastic programming approach for characterization of parameter uncertainties and their interactions: an application to water resources management ⋮ Risk-based factorial probabilistic inference for optimization of flood control systems with correlated uncertainties ⋮ Incorporating human factors-related performance variation in optimizing a serial system
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Generating Scenario Trees for Multistage Decision Problems
- Stochastic programming in water management: A case study and a comparison of solution techniques
- Optimization of a large-scale water reservoir network by stochastic dynamic programming with efficient state space discretization
- Multi-objective optimization of water-using systems
- Stochastic network optimization models for investment planning
- Applying stochastic goal programming: a case study on water use planning
- Dynamic stochastic programming for asset-liability management
- A hybrid inexact-stochastic water management model
- Decomposition methods in stochastic programming
- WARSYP: A robust modeling approach for water resources system planning under uncertainty
- A comparison of multiple criteria analysis techniques for water resource management
- Short-term hydropower production planning by stochastic programming
- Stochastic facility location with general long-run costs and convex short-run costs
- An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty
- Stochastic decomposition. A statistical method for large scale stochastic linear programming
- Coherent Measures of Risk
- Formulation of the Russell-Yasuda Kasai Financial Planning Model
- Scenarios and Policy Aggregation in Optimization Under Uncertainty
- Introduction to Stochastic Programming
- A Dynamic Network Flow Problem with Uncertain arc Capacities: Formulation and Problem Structure
- An application of Lagrangian relaxation to a capacity planning problem under uncertainty
- Applications of Stochastic Programming
- An asset liability management model for casualty insurers: Complexity reduction vs. parameterized decision rules
- A single-period model for conjunctive use of ground and surface water under severe overdrafts and water deficit
This page was built for publication: Cost/risk balanced management of scarce resources using stochastic programming