scientific article; zbMATH DE number 1281666
From MaRDI portal
Publication:4240868
Recommendations
- Discrete-continuous scheduling to minimize the makespan for power processing rates of jobs
- On a methodology for discrete-continuous scheduling
- Heuristic procedures for allocating the continuous resource in discrete-continuous scheduling problems
- A heuristic approach to allocating the continuous resource in discrete--continuous scheduling problems to minimize the makespan
- Discrete-continuous scheduling problems -- mean completion time results
Cited in
(7)- Discrete-continuous scheduling to minimize the makespan for power processing rates of jobs
- scientific article; zbMATH DE number 955199 (Why is no real title available?)
- Neighbourhood properties in some single processor scheduling problem with variable efficiency and additional resources
- Solving the discrete-continuous project scheduling problem via its discretization
- Makespan optimization in a single-machine scheduling problem with dynamic job ready times-complexity and algorithms
- A heuristic approach to allocating the continuous resource in discrete--continuous scheduling problems to minimize the makespan
- Structure vs. efficiency of the cross-entropy based population learning algorithm for discrete-continuous scheduling with continuous resource discretisation
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4240868)