Improving job shop performance by coordinating dispatching rules
From MaRDI portal
Publication:4245209
Recommendations
- Look ahead job demanding for improving job shop performance
- Dispatching rules for scheduling in assembly jobshops - Part 1
- New dispatching rules for shop scheduling: A step forward
- Dispatching rules for scheduling in assembly jobshops - Part 2
- Dispatching rules in scheduling Dispatching rules in scheduling: a fuzzy approach
Cited in
(8)- Look ahead job demanding for improving job shop performance
- A cooperative dispatching approach for minimizing mean tardiness in a dynamic flowshop
- Decentralised, multi-objective driven scheduling for reentrant shops: a conceptual development and a test case
- Simulation study of coordinating layout change and quality improvement for adapting job shop manufacturing to CONWIP control
- New expression of scheduling performance measures
- A PMBGA to optimize the selection of rules for job shop scheduling based on the Giffler-Thompson algorithm
- Dispatching rules for scheduling in assembly jobshops - Part 1
- Scheduling in dynamic assembly job-shops with jobs having different holding and tardiness costs
This page was built for publication: Improving job shop performance by coordinating dispatching rules
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245209)