A generalized economic model for joint determination of production run, inspection schedule and control chart design
From MaRDI portal
Publication:4245502
DOI10.1080/002075498194047zbMath0951.90515OpenAlexW2171603393MaRDI QIDQ4245502
No author found.
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075498194047
Related Items
A common cycle approach for solving the economic lot and inspection scheduling problem, An extension of Ben-Daya–Rahim (2000) and Rahim–Banerjee (1993) cost models for economic design ofT2-control charts for multivariate deteriorating processes with preventive maintenance and early replacement, Optimal preventive maintenance for equipment with two quality states and general failure time distributions, A generalized model for multiplicity-cause economic and economic statistical design of -control charts with proportional hazards shock model, A generalized version of Ben-Daya-Rahim (2000) and Rahim-Banerjee (1993) cost models in economic design of <ovl>X</ovl>-control charts for systems with early replacement and preventive maintenance under decreasing integrated hazard, Optimal and simple algorithms to solve integrated procurement-production-inventory problem without/with shortage, Multivariate extension to the economical design of control chart under Weibull shock model, ECONOMIC PRODUCTION RUN LENGTH AND WARRANTY PERIOD FOR PRODUCT WITH WEIBULL LIFETIME, An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart, An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length, Effect of maintenance on the economic design of \(\overline x\)-control chart, Economic Design of andRCharts Under Weibull Shock Models