A generalized economic model for joint determination of production run, inspection schedule and control chart design
From MaRDI portal
Publication:4245502
Recommendations
Cited in
(18)- Optimal and simple algorithms to solve integrated procurement-production-inventory problem without/with shortage
- ECONOMIC PRODUCTION RUN LENGTH AND WARRANTY PERIOD FOR PRODUCT WITH WEIBULL LIFETIME
- Economic design of \(\overline{X}\) and \(R\) charts under Weibull shock models
- A common cycle approach for solving the economic lot and inspection scheduling problem
- Effect of maintenance on the economic design of \(\overline x\)-control chart
- Economic optimization of off-line inspection in a process that also produces non-conforming units when in control and conforming units when out of control
- Simultaneous optimization of inventory, maintenance, and quality for production systems subject to multiple mean and variance shifts
- A generalized version of Ben-Daya-Rahim (2000) and Rahim-Banerjee (1993) cost models in economic design of <ovl>X</ovl>-control charts for systems with early replacement and preventive maintenance under decreasing integrated hazard
- An integrated optimization model for inventory and quality control problems
- scientific article; zbMATH DE number 1873232 (Why is no real title available?)
- A generalized model for multiplicity-cause economic and economic statistical design of -control charts with proportional hazards shock model
- An integrated quality, maintenance and production model based on the delayed monitoring under the ARMA control chart
- An optimal production lot-sizing problem for an imperfect process with imperfect maintenance and inspection time length
- An extension of Ben-Daya-Rahim (2000) and Rahim-Banerjee (1993) cost models for economic design of \(T^2\)-control charts for multivariate deteriorating processes with preventive maintenance and early replacement
- A Model for Continuous Production Control with Warning Signals to Fault Occurrences
- Multivariate extension to the economical design of control chart under Weibull shock model
- An approximate economically optimal inspection interval for production processes with finite run length
- Optimal preventive maintenance for equipment with two quality states and general failure time distributions
This page was built for publication: A generalized economic model for joint determination of production run, inspection schedule and control chart design
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245502)