Production sequencing problem with re-entrant work flows and sequence dependent setup times
From MaRDI portal
(Redirected from Publication:4245659)
Recommendations
- Scheduling problem in a two-machine flow line with theN-step prior-job-dependent set-up times
- Sequence-dependent setup times in a two-machine job-shop with minimizing the schedule length
- Job shop scheduling with separable sequence-dependent setups
- Using genetic algorithm in two-machine flexible flow-shop scheduling with setup times
- Solving the flexible job shop scheduling problem with sequence-dependent setup times
Cited in
(7)- Decomposition methods for reentrant flow shops with sequence-dependent setup times
- A cloud based job sequencing with sequence-dependent setup for sheet metal manufacturing
- A survey of scheduling problems with setup times or costs
- Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches
- Decentralised, multi-objective driven scheduling for reentrant shops: a conceptual development and a test case
- Scheduling problem in a two-machine flow line with theN-step prior-job-dependent set-up times
- Modelling and analysis of wafer fabrication scheduling via generalized stochastic Petri net and simulated annealing
This page was built for publication: Production sequencing problem with re-entrant work flows and sequence dependent setup times
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245659)