Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems
From MaRDI portal
Publication:4245676
Recommendations
- A multi-period order selection problem in flexible manufacturing systems
- Loading and scheduling for flexible manufacturing systems with controllable processing times
- Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
- Due date and cost-based FMS loading, scheduling and tool management
- Exact solution procedures for certain planning problems in flexible manufacturing systems
Cited in
(2)
This page was built for publication: Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245676)