Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems
From MaRDI portal
Publication:4245676
DOI10.1080/002075498192418zbMATH Open0953.90553OpenAlexW2157991438MaRDI QIDQ4245676FDOQ4245676
Authors:
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075498192418
Recommendations
- A multi-period order selection problem in flexible manufacturing systems
- Loading and scheduling for flexible manufacturing systems with controllable processing times
- Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
- Due date and cost-based FMS loading, scheduling and tool management
- Exact solution procedures for certain planning problems in flexible manufacturing systems
Cited In (2)
This page was built for publication: Iterative procedures for multi-period order selection and loading problems in flexible manufacturing systems
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4245676)