A case study in a dual resource constrained job shop
From MaRDI portal
Publication:4245706
DOI10.1080/002075498192319zbMath0946.90514OpenAlexW2156504736MaRDI QIDQ4245706
No author found.
Publication date: 8 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075498192319
Related Items (2)
A multi-criteria adaptive control scheme based on neural networks and fuzzy inference for DRC manufacturing systems ⋮ Dynamic job shop scheduling for missed due date performance
This page was built for publication: A case study in a dual resource constrained job shop