Numerical investigation of optimal policies for production flow control and set-up scheduling: Lessons from two-part-type failure-prone FMSs
From MaRDI portal
Publication:4252098
DOI10.1080/002075497194769zbMath0945.90586OpenAlexW2095743991WikidataQ105789701 ScholiaQ105789701MaRDI QIDQ4252098
George Liberopoulos, Michael Caramanis
Publication date: 17 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/002075497194769
Related Items (3)
The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers ⋮ Dynamic modeling and control of supply chain systems: A review ⋮ Operational level-based policies in production rate control of unreliable manufacturing systems with set-ups
This page was built for publication: Numerical investigation of optimal policies for production flow control and set-up scheduling: Lessons from two-part-type failure-prone FMSs