Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups
From MaRDI portal
Publication:4252128
Recommendations
- Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies
- A simple lot-scheduling model for just-in-time manufacturing
- A Lot-sizing Model for Just-in-time Manufacturing
- A Lagrangian heuristic for an integrated lot-sizing and fixed scheduling problem
- Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources
Cited in
(10)- Hybrid simulated annealing and MIP-based heuristics for stochastic lot-sizing and scheduling problem in capacitated multi-stage production system
- Just-in-time planning and lot-sizing
- A genetic algorithm for simultaneous optimisation of lot sizing and scheduling in a flow line assembly
- Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon
- Capacity-constrained production scheduling of multiple vehicle programs in an automotive pilot plant
- A Lot-sizing Model for Just-in-time Manufacturing
- Integrated scheduling of material handling and manufacturing activities for just-in-time production of complex assemblies
- A simple lot-scheduling model for just-in-time manufacturing
- Waste disposal and waste avoidance
- Using the EPQ for coordinated planning of a product with partial backordering and its components
This page was built for publication: Integrated lot-sizing and scheduling for just-in-time production of complex assemblies with finite set-ups
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4252128)