A bivariate optimal replacement policy for a cold standby repairable system with preventive repair
From MaRDI portal
Publication:426321
DOI10.1016/J.AMC.2011.08.050zbMath1239.90039OpenAlexW1986109441MaRDI QIDQ426321
Publication date: 11 June 2012
Published in: Applied Mathematics and Computation (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.amc.2011.08.050
renewal processcold standby systemgeometric processaverage cost ratepreventive repairrepair-replacement policy
Related Items (4)
A geometric process warranty model using a combination policy ⋮ On reliability analysis of a two-dependent-unit series system with a standby unit ⋮ Copula-based reliability analysis for a parallel system with a cold standby ⋮ Optimal replacement policy for a two-dissimilar-component cold standby system with different repair actions
Cites Work
- Unnamed Item
- Unnamed Item
- A geometric process maintenance model with preventive repair
- Geometric processes and replacement problem
- A note on optimal replacement policy under general repair
- Analysis of a parallel system with two different units
- A geometrical process repair model for a repairable system with delayed repair
- Imperfect repair
- Optimum Preventive Maintenance Policies
- Optimal strategies for some repair replacement models
- Age-dependent minimal repair
- A note on the optimal replacement problem
- Some results for repairable systems with general repair
- Optimal Number of Minimal Repairs before Replacement
- A bivariate optimal replacement policy for a repairable system
- Optimization of preventive maintenance for two-unit cold standby redundant systems with a general cost structure
- An optimal replacement policy for repairable cold standby system with priority in use
- Replacement problems for a cold standby repairable system
This page was built for publication: A bivariate optimal replacement policy for a cold standby repairable system with preventive repair