scientific article; zbMATH DE number 495273
From MaRDI portal
Publication:4277261
Recommendations
- A branch and bound algorithm to minimize the total tardiness for m-machine permutation flowshop problems
- Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine
- Minimizing total tardiness in permutation flowshops
- STACS 2004
- scientific article; zbMATH DE number 811323
- Total tardiness minimization in permutation flowshop with deterioration consideration
- Minimizing the weighted number of tardy jobs on a two-machine flow shop.
- Minimizing the Expected Weighted Number of Tardy Jobs in the Stochastic Two-Machine Flow Shop
- An exact algorithm for the single-machine total weighted tardiness problem with sequence-dependent setup times
Cited in
(2)
This page was built for publication:
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4277261)