Better Estimation of PERT Activity Time Parameters
From MaRDI portal
Publication:4282282
DOI10.1287/MNSC.39.9.1086zbMATH Open0800.90575OpenAlexW2085757315MaRDI QIDQ4282282FDOQ4282282
Authors: Donald L. Keefer, William A. Verdini
Publication date: 14 March 1994
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.39.9.1086
Cited In (17)
- An alternative for robust estimation in project management
- An approximation of the activity duration distribution in PERT.
- Mixture densities for project management activity times: A robust approach to PERT
- Estimating uncertainties using judgmental forecasts with expert heterogeneity
- Finding the critical path in an activity network with time-switch constraints
- Managing projects with uncertain deadlines
- The generalized two-sided beta distribution with applications in project risk analysis
- The model identification of beta distribution based on quantiles
- The effects of reducing demand uncertainty in a manufacturer-retailer channel for single-period products
- On ANOVA expansions and strategies for choosing the anchor point
- A link between two-sided power and asymmetric Laplace distributions: with applications to mean and variance approximations
- Reexamining discrete approximations to continuous distributions
- The generalized two-sided power distribution
- Critical path in an activity network with time constraints
- Optimal keyword bids in search-based advertising with stochastic advertisement positions
- Distribution of the Activity Time in Network Analysis: A Critical Revisit with a Gamma Alternative
- A comparison of procedures for estimating the parent probability distribution from a given set of fractiles
This page was built for publication: Better Estimation of PERT Activity Time Parameters
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4282282)