New Lower and Upper Bounds for Scheduling Around a Small Common Due Date
From MaRDI portal
Publication:4287604
DOI10.1287/OPRE.42.1.102zbMATH Open0798.90085OpenAlexW2083187712MaRDI QIDQ4287604FDOQ4287604
Authors: Han Hoogeveen, H. Oosterhout, Steef van de Velde
Publication date: 6 November 1994
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://semanticscholar.org/paper/b0f87a69e04e06223a54ecb75108676a4d0e933f
Recommendations
- Scheduling about a common due date with earliness and tardiness penalties
- Single-machine scheduling to minimize absolute deviation of completion times from a common due date
- The single machine earliness and tardiness scheduling problem: lower bounds and a branch-and-bound algorithm
- Scheduling around a small common due date
- Common due date assignment and scheduling with ready times
Cited In (15)
- Parallel machine scheduling with a common due window
- A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems
- Just-in-time scheduling with equal-size jobs
- A survey of the state-of-the-art of common due date assignment and scheduling research
- Minimizing total weighted earliness-tardiness on a single machine around a small common due date: an FPTAS using quadratic knapsack
- The symmetric quadratic knapsack problem: approximation and scheduling applications
- Scheduling by positional completion times: Analysis of a two-stage flow shop problem with a batching machine
- Minimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability interval
- Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties
- Single machine weighted earliness-tardiness penalty problem with a common due date
- Optimizing the half-product and related quadratic Boolean functions: approximation and scheduling applications
- Formulating a scheduling problem with almost identical jobs by using positional completion times
- Multicriteria scheduling
- Machine scheduling with earliness, tardiness and non-execution penalties
- Error Bound of a Heuristic for the Common Due Date Scheduling Problem
This page was built for publication: New Lower and Upper Bounds for Scheduling Around a Small Common Due Date
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4287604)