Multi-Item Single-Machine Scheduling with Material Supply Constraints
From MaRDI portal
Publication:4287652
DOI10.1057/JORS.1993.186zbMATH Open0801.90063OpenAlexW1979437523MaRDI QIDQ4287652FDOQ4287652
Authors: Robert C. Leachman, André Gascon, Zhong K. Xiong
Publication date: 12 April 1994
Published in: The Journal of the Operational Research Society (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1057/jors.1993.186
Recommendations
- Fast computational procedure for solving multi-item single-machine lot scheduling optimzation problems
- scientific article; zbMATH DE number 1766737
- scientific article; zbMATH DE number 1487922
- scientific article; zbMATH DE number 4059107
- On single machine scheduling with resource constraint
- scientific article; zbMATH DE number 433058
- A multi-objective approach to resource allocation in single machine scheduling
- Parameterized multi-scenario single-machine scheduling problems
- scientific article; zbMATH DE number 4072697
- Complexity of single machine scheduling subject to nonnegative inventory constraints
Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Production models (90B30)
Cited In (5)
- A Dynamic Programming Solution to the Dynamic, Multi-Item, Single-Machine Scheduling Problem
- A multivariate complexity analysis of the material consumption scheduling problem
- Capacitated lot sizing and scheduling with parallel machines and shared buffers: A case study in a packaging company
- Lot sizing and scheduling -- survey and extensions
- Material allocation in MRP with tardiness penalties
This page was built for publication: Multi-Item Single-Machine Scheduling with Material Supply Constraints
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4287652)