Polyhedral Characterization of the Economic Lot-Sizing Problem with Start-Up Costs
From MaRDI portal
Publication:4287947
DOI10.1137/S0895480191196289zbMATH Open0801.90033OpenAlexW1984178023MaRDI QIDQ4287947FDOQ4287947
Authors: Stan Van Hoesel, Albert P. M. Wagelmans, Laurence A. Wolsey
Publication date: 12 May 1994
Published in: SIAM Journal on Discrete Mathematics (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1137/s0895480191196289
Recommendations
shortest pathpolyhedral descriptionplant locationstrong valid inequalitiessingle-item uncapacitated economic lot-sizing problem
Cited In (21)
- The single-item lot-sizing polytope with continuous start-up costs and uniform production capacity
- Title not available (Why is that?)
- Single-item dynamic lot-sizing problems: an updated survey
- A cutting plane approach to capacitated lot-sizing with start-up costs
- LS-LIB: a library of tools for solving production planning problems
- A cutting plane algorithm for a single machine scheduling problem
- Valid inequalities and projecting the multicommodity extended formulation for uncapacitated fixed charge network flow problems
- Polyhedral techniques in combinatorial optimization I: Theory
- Relaxations for two-level multi-item lot-sizing problems
- Uncapacitated lot-sizing: The convex hull of solutions
- MIP modelling of changeovers in production planning and scheduling problems
- A polyhedral study of the single-item lot-sizing problem with continuous start-up costs
- A cutting plane algorithm for MV portfolio selection model
- Uncapacitated Lot-Sizing Problems with Start-Up Costs
- A branch-and-cut algorithm for the stochastic uncapacitated lot-sizing problem
- Polyhedra for lot-sizing with Wagner-Whitin costs
- Progress with single-item lot-sizing
- Uncapacitated lot-sizing with buying, sales and backlogging
- Stochastic lot-sizing problem with deterministic demands and Wagner-Whitin costs
- Some classes of valid inequalities and convex hull characterizations for dynamic fixed-charge problems under nested constraints
- The multi-item capacitated lot-sizing problem with setup times and shortage costs
This page was built for publication: Polyhedral Characterization of the Economic Lot-Sizing Problem with Start-Up Costs
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4287947)