Equipment Selection and Machine Scheduling in General Mail Facilities
From MaRDI portal
Publication:4320096
DOI10.1287/mnsc.40.8.1049zbMath0816.90098OpenAlexW2107653312MaRDI QIDQ4320096
Anura H. DeSilva, Ahmad I. Jarrah, Jonathan F. Bard
Publication date: 15 January 1995
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.40.8.1049
Applications of mathematical programming (90C90) Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Case-oriented studies in operations research (90B90)
Related Items (4)
Novel Formulations and Logic-Based Benders Decomposition for the Integrated Parallel Machine Scheduling and Location Problem ⋮ Generating labor requirements and rosters for mail handlers using simulation and optimization ⋮ Sequencing the processing of incoming mail to match an outbound truck delivery schedule ⋮ Comparative approaches to equipment scheduling in high volume factories
Uses Software
This page was built for publication: Equipment Selection and Machine Scheduling in General Mail Facilities