An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
DOI10.1016/J.INS.2011.06.014zbMATH Open1242.90082OpenAlexW1971534795MaRDI QIDQ433107FDOQ433107
Publication date: 13 July 2012
Published in: Information Sciences (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ins.2011.06.014
Recommendations
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
- An efficient differential evolution algorithm for multi-mode resource-constrained project scheduling problems
- An improved ant algorithm for multi-mode resource constrained project scheduling problem
- An effective shuffled frog-leaping algorithm for multi-objective flexible job shop scheduling problems
- An efficient algorithm for the multi-mode resource constrained project scheduling problem with resource flexibility
backward improvementcombined local searchmulti-mode forwardmulti-mode permutation based local searchmulti-mode resource-constrained project schedulingmulti-mode serial schedule generation schemeshuffled frog-leaping algorithm
Cites Work
- PSPLIB -- a project scheduling problem library
- A combinatorial particle swarm optimization for solving multi-mode resource-constrained project scheduling problems
- Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling
- A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version.
- Solving the Multi-Mode Resource-Constrained Project Scheduling Problem with genetic algorithms
- Project scheduling with multiple modes: A genetic algorithm
- Simulated annealing for multi-mode resource-constrained project scheduling
- An iterative scheduling technique for resource-constrained project scheduling
- Differential evolution for solving multi-mode resource-constrained project scheduling problems
- Multi-mode resource-constrained project scheduling by a simple, general and powerful sequencing algorithm
- An exact algorithm for project scheduling with multiple modes
- Strength and adaptability of problem-space based neighborhoods for resource-constrained scheduling
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem
- Solving a bi-criteria permutation flow-shop problem using shuffled frog-leaping algorithm
Cited In (11)
- Solving distributed two-stage hybrid flowshop scheduling using a shuffled frog-leaping algorithm with memeplex grouping
- A diversified shuffled frog leaping: an application for parameter identification
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem
- A path-relinking algorithm for the multi-mode resource-constrained project scheduling problem
- Credit risk prediction using fuzzy immune learning
- A fuzzy time-dependent project scheduling problem
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem
- An updated survey of variants and extensions of the resource-constrained project scheduling problem
- An improved shuffled frog-leaping algorithm for flexible job shop scheduling problem
- Multi-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policies
Uses Software
This page was built for publication: An effective shuffled frog-leaping algorithm for multi-mode resource-constrained project scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q433107)