Implementing Setup Optimization on the Shop Floor
From MaRDI portal
Publication:4346335
DOI10.1287/opre.44.6.843zbMath0879.90107OpenAlexW2009744457MaRDI QIDQ4346335
Fereydoon Safai, M. Eric Johnson, Shailandra Jain
Publication date: 25 January 1998
Published in: Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/opre.44.6.843
flexible manufacturingprinted circuit board assemblysequencing production on a flexible assembly line
Related Items
Optimal versus heuristic scheduling of surface mount technology lines ⋮ Optimization of the assignment of circuit cards to assembly lines in electronics assembly ⋮ Heuristic approaches for batching jobs in printed circuit board assembly ⋮ The tool switching problem revisited ⋮ Storage management of items in two levels of availability ⋮ Production planning problems in printed circuit board assembly ⋮ Greedy solutions of selection and ordering problems