The Multi-Item Setup-Reduction Investment-Allocation Problem with Continuous Investment-Cost Functions
From MaRDI portal
Publication:4356635
DOI10.1287/MNSC.43.6.890zbMATH Open0893.90052OpenAlexW1979837404MaRDI QIDQ4356635FDOQ4356635
Authors: John P. Leschke, Elliott N. Weiss
Publication date: 22 July 1998
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.43.6.890
Recommendations
- An analysis of setup cost reduction in a two stage system
- Publication:4888208
- Multiproduct economic lot size models with investment costs for setup reduction and quality improvement: review and extensions
- Strategic investment to reduce setup times in the economic lot scheduling problem
- Joint investment in quality improvement and setup reduction
inventory managementmulti-product systemsetup reductioneconomic order quantity modelsinvestment priorities
Cited In (13)
- An Economic Model for Justifying the Reduction of Delivery Variance in an Integrated Supply Chain
- Strategic investment to reduce setup times in the economic lot scheduling problem
- Controlling lead times and minor ordering costs in the joint replenishment problem with stochastic demands under the class of cyclic policies
- Reducing the cost of untimely supply chain delivery performance for asymmetric Laplace distributed delivery
- Joint investment in quality improvement and setup reduction
- Title not available (Why is that?)
- Limited investment budget analysis in multi-item production facilities
- Supply chain coordination with downstream operating costs: coordination and investment to improve downstream operating efficiency
- Supply chain coordination and setup cost reduction in case of asymmetric information
- A mixed integer linear programming model for set-up reduction superstructures
- Inventory and investment in setup and quality operations under return on investment maximization
- Managerial and economic impacts of reducing delivery variance in the supply chain
- Shipment lead time hedging and coordination in prefabricated construction supply chain
This page was built for publication: The Multi-Item Setup-Reduction Investment-Allocation Problem with Continuous Investment-Cost Functions
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4356635)