Scheduling Parallel Manufacturing Cells with Resource Flexibility
From MaRDI portal
Publication:4363675
DOI10.1287/mnsc.42.9.1260zbMath0880.90060MaRDI QIDQ4363675
Richard L. Daniels, Joseph B. Mazzola, Barbara J. Hoopes
Publication date: 12 November 1997
Published in: Management Science (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1287/mnsc.42.9.1260
Related Items
Impact of worker and shop flexibility on assembly cells, Scheduling of unrelated parallel manufacturing cells with limited human resources, Scheduling identical parallel machines and operators within a period based changing mode, Scheduling with flexible resources in parallel workcenters to minimize maximum completion time, Scheduling uniform parallel machines subject to a secondary resource to minimize the number of tardy jobs, Minimizing the number of late jobs for the permutation flowshop problem with secondary resources, Process flexibility: design, evaluation, and applications, Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound, A new bounding mechanism for the CNC machine scheduling problems with controllable processing times