Demand shuffle?A method for multilevel proportional lot sizing and scheduling
From MaRDI portal
Publication:4367290
DOI10.1002/(SICI)1520-6750(199706)44:4%3C319::AID-NAV3%3E3.0.CO;2-9zbMATH Open0889.90056OpenAlexW2032596782MaRDI QIDQ4367290FDOQ4367290
Publication date: 25 November 1997
Full work available at URL: https://doi.org/10.1002/(sici)1520-6750(199706)44:4%3C319::aid-nav3%3E3.0.co;2-9
Deterministic scheduling theory in operations research (90B35) Inventory, storage, reservoirs (90B05) Production models (90B30)
Cited In (6)
- Um modelo de otimização para o problema integrado de dimensionamento de lotes e programação da produção em fábricas de refrigerantes
- Heuristic solution methods for the selective disassembly sequencing problem under sequence-dependent costs
- Lot sizing and scheduling -- survey and extensions
- The synchronized and integrated two-level lot sizing and scheduling problem: evaluating the generalized mathematical model
- Operations planning test bed under rolling horizons, multiproduct, multiechelon, multiprocess for capacitated production planning modelling with \textit{strokes}
- Simultaneous lotsizing and scheduling problems: a classification and review of models
Recommendations
This page was built for publication: Demand shuffle?A method for multilevel proportional lot sizing and scheduling
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4367290)