Production planning for a multi-item, single-stage kanban system
From MaRDI portal
Publication:4394261
DOI10.1080/00207549408956994zbMATH Open0901.90118OpenAlexW2011987650MaRDI QIDQ4394261FDOQ4394261
Authors: M. George Mitwasi, Ronald G. Askin
Publication date: 26 November 1998
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549408956994
Recommendations
- A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
- scientific article; zbMATH DE number 1859335
- Optimal numbers of two kinds of kanbans in a JIT production system
- A kanban system as a manufacturing control system with feedback
- Kanban-controlled manufacturing systems.
Cites Work
- Computing Optimal Lot Sizes in the Economic Lot Scheduling Problem
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- A Mathematical Programming Approach to a Deterministic Kanban System
- A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
Cited In (14)
- Kanban policy improvement thanks to a (max,+)-algebra analysis
- Multiproduct Kanban-like Control Systems
- Title not available (Why is that?)
- A dynamic programming model for the kanban assignment problem in a multistage multiperiod production system
- Kanban-controlled manufacturing systems.
- Decentralized reactive Kanban system
- Allocating work in process in a multiple-product CONWIP system with lost sales
- The Kanban assignment problem -- A non-integral approach
- A neural network procedure for kanban allocation in JIT production control systems
- Short-term robustness of production management systems: A case study.
- A Mathematical Programming Approach to a Deterministic Kanban System
- Flexible kanbans to enhance volume flexibility in a JIT environment: a simulation based comparison via anns
- Algorithms for the design of a multi-stage adaptive kanban system
- Title not available (Why is that?)
This page was built for publication: Production planning for a multi-item, single-stage kanban system
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4394261)