Scheduling duplicate serial stations in transfer lines
From MaRDI portal
Publication:4394380
DOI10.1080/00207549408957088zbMath0896.90122OpenAlexW2068885802MaRDI QIDQ4394380
No author found.
Publication date: 1 October 1998
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549408957088
heuristicproduction ratefailure and repair characteristicstransfer line stations with long cycle times
Related Items (7)
Flow-shop scheduling for three serial stations with the last two duplicate ⋮ A versatile algorithm for assembly line balancing ⋮ Heuristics and simulated annealing procedures for the accessibility windows assembly line problem level 1 (AWALBP-L1) ⋮ An efficient branch and bound algorithm for assembly line balancing problems with parallel multi-manned workstations ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique ⋮ Balancing assembly lines with variable parallel workplaces: problem definition and effective solution procedure ⋮ A survey on problems and methods in generalized assembly line balancing
Cites Work
This page was built for publication: Scheduling duplicate serial stations in transfer lines