A note on improving the performance of the enhanced dynamic cycte lengths heuristic for the multi-item, single machine scheduling problem
DOI10.1080/00207549508930183zbMATH Open0915.90147OpenAlexW2089191839MaRDI QIDQ4398947FDOQ4398947
Authors: André Gascon, Robert C. Leachman, Pierre Lefrançois
Publication date: 16 June 1999
Published in: International Journal of Production Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1080/00207549508930183
Recommendations
- Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
- A Heuristic Scheduling Policy for Multi-Item, Multi-Machine Production Systems with Time-Varying, Stochastic Demands
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
heuristicsstochastic, time-varying demandsenhanced dynamic cycle lengths heuristicmulti-item, single-machine problem
Cites Work
- Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics
- A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands
- Note: An Improvement to the Dynamic Cycle Lengths Heuristic for Scheduling the Multi-Item, Single-Machine
Cited In (1)
This page was built for publication: A note on improving the performance of the enhanced dynamic cycte lengths heuristic for the multi-item, single machine scheduling problem
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q4398947)